The following is a detailed explanation about the primary maintenance of injection mold:
1.Maintenance during moulding
The upper and lower surfaces of the injection mould should be cleaned before the injection mould is installed to ensure that the installation surface of the injection mould and the working table surface of the press yizekv18 are not crushed and the parallelism of the upper and lower installation surfaces of the injection mould in production is ensured.
2.Maintenance of injection mold in production
The corresponding parts of the injection mould, such as guide pillars, are regularly oiled in production.
3.Post-production Maintenance
After the end of production, the injection mould should be inspected comprehensively. The injection moulds should be cleaned completely to ensure the cleanliness of the injection moulds. Clean up the waste in the injection mould to ensure that there is no waste in the waste box.
The primary maintenance of injection mold is conducive to the production of high-quality injection mold parts, which should be widely promoted.
yizekv19
The above article from YIZE official website(http://www.yizemoulds.com/)
The original address:http://www.yizemoulds.com/news_show_6_29_859.html, reproduced please specify.

没有评论:
发表评论